With the aim of significantly improving the water supply in the city of Granada as well as improving the water quality at the lakeshore, Fichtner was engaged to carry out a feasibility study as well as the complete technical planning of the rehabilitation and extension of the city's water supply and sewerage networks. In addition to the engineering of the required measures, the institutional strengthening of ENACAL was also developed. This included a proposal for the creation of a regional water supply and sanitation company, which had not yet been established.

Our services

  • Commercial and socio-economic studies
  • Hydrological and hydraulic investigations
  • Leak detection
  • Environmental impact assessment
  • Official approval procedures
  • Construction and commissioning supervision
  • Training and capacity building programme for operational and administrative staff
  • Institutional strengthening and operational planning
  • Awareness building

Technical data

  • Sewerage network for approx. 42,000 inhabitants
  • Extension of the network by approx. 50 km
  • Construction of approx. 6,000 house connections
  • Rehabilitation of a sewage pumping station and construction of a new one
  • Rehabilitation and extension of WWTP, construction of pre-treatment and treatment system and administrative buildings
  • Improvement and extension of the water supply network, with pipelines for the main network and for the distribution network
  • Supply and installation of equipment for a 110 m deep well and approx. 1.6 km main delivery pipelines

Client

ENACAL, Managua, Nicaragua