Technical engineering of CO₂ capture and liquefaction plant interfaces, Latin America
Fichtner was engaged by a major industrial utility company to provide technical interface engineering for a new CO₂ capture and liquefaction plant, planned on the plot of a cogeneration plant. In a first step, Fichtner analyzed the integration of the CO₂ capture and liquefaction plant by assessing potential tie-ins and calculating the performance impact as a result of the power & utilities supply to the new plant. In a second step, a basic engineering study for the identified interfaces was elaborated.
Our services
- Technical interface assessment and evaluation of operational impacts
- Flue gas interface
- Electrical interface
- Cooling water interface
- Steam and condensate interfaces
- Demineralized water interface
- Caustic soda interface
- Process drain interface
Technical data
- Cogeneration plant based on H-class gas turbine with process steam extraction to a chemical park
- CO₂ capture and liquefaction plant for several 10,000 tons CO₂ per year